My server Rack - update








My rack is nearly full now
From the top I have,
15" LCD screen
24port 10/100 level 2 switch dealing with the VLANs
16port 10/100/1000 level 1 switch 
1TB HDD 1.66 GHz Dual core custom NAS FTP/HTTP/VPN running windows server 2003
P4 1.6 GHz 1GB ram Pfsense Firewall router (not in use)
Wireless N AP and ADSL2+ modem
CD2 2.4 GHz 3GB RAM dual TV cards (turns itself on and records TV when needed)
CISCO 3640 Dual 10/100 NICs with serial (only used when I am testing stuff)
APC SMART 1000VA UPS and Compaq 2000VA UPS

Wednesday, February 2, 2011

Cleaning!

A few days of cleaning

This is about one days worth of cleaning plus 4 cubic meters of rubbish been taken away, as you can see i have started to move stuff in, starting with my 19" server rack, i will be adding side panels to is shortly to keep out dust.

Sunday, January 30, 2011

Moving!!!


Over the next few weeks I will be moving into my new place, I have lots to do as to be seen in the following pictures, this means I am unable to finish my write-up on the PC controlled relay light as of this time, sorry. 


The workshop

The workshop
 
As the house was pretty much a deceased estate there is a lot of mess to clean up.
1.300AMP arc welder
2.Metal lathe
3.Band saw
There is also a lot more I was unable to take pictures of as the room was in too much of a mess more images on their way tomorrow.

This was an interesting find, a Vietnam war night vision scope that seems to be in complete, all but one part.
Dat view

Monday, January 17, 2011

First post of the year.

Happy new year everyone.
This year i will be posting lots more stuff here on my blog.

The first thing i will be is an update on my PC controlled relay light i did back in 2008.
This is the video i did all the way back then, as you can see its not very informative, i hope to fix that now with a detailed writeup/howto and a new video.